Date Of Advertisement: Jul 10, 2019

Steve P. Rados, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, MBE, WBE, SBE, HUBZ
sub-contractors and/or material suppliers for the following project:

Reference: 199.100
Wastewater Treatment Plant Improvement For Dpt. Of PW CSA No. 17 Cottonwood Project Cottonwwod.,CA
Cottonwood, CA
Located in Shasta County, CA

Owner: County Of Shasta

Bid Date: Aug 15, 2019  at  03:00 PM

We are requesting bids for the following trades and/or material suppliers:
We are attempting to obtain the highest possible participation of DBE (includes WBE, MBE, SBE, HUB, SBRA , LSAF) for the following supplies & items of work, but not limited to: sand & gravel, asphalt, concrete & cement, lumber, pipe, tools, construction materials, clearing & grubbing, grading, structure excavation, structure backfill, finishing roadway, aggregate base, asphalt concrete, paving asphalt (asphalt concrete), concrete structure, minor concrete structure, joint seal-water stop, reinforcing steel. clean & paint steel, plastic pipe, drainage pumping equipment, pumping plant electrical equipment, misc. bridge metal pumping plant metal, bottom dump trucking, transfer dump truck, super 10 dump truck, flat bed trucking, water truck, end dump truck, street sweeping truck, trucker, carpentry, painting structures, commercial electrical

Bid documents can be viewed at or obtained from:
PACE Engineering, 1730 South Street, Redding, CA 96001, tel 530-244-0202

Engineer's Estimate: $4,000,000- $5,000,000 Steve P. Rados, Inc. (SPR) is an Equal Opportunity Employer and a signatory union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions, and insurance requirements. SPR’s listing of a subcontractor is not to be construed as an acceptance of all subcontractor’s conditions or exceptions included with the subcontractor’s quotes. Subcontractors will be required to provide payment & performance bond from an approved surety company for 100% of the value of the subcontracted work. SPR will pay bond premium up to 1.5%(optional). We will split items of work and provide assistance for obtaining bonds, lines of credit and/or insurance. Assistance is available in obtaining necessary equipments, supplies, materials & related assistance or services. SPR requires that subcontractors and suppliers price quote be provided at a reasonable time prior to bid to enable a complete evaluation. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by DBEs in the competitive process. We also require that subcontractors comply with Good Faith Effort in accordance with the law and bid requirements.

Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana, CA 92705

Phone: (916) 475-1654  Fax: (916) 475-1655
Email: crowe@radoscompanies.com
Chris Rowe

Published Jul 10, 2019 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: 1-888-786-9450 Fax: 209.772.3573

This solicitation Ad will be archived 30 days after the bid date

The social media bar for sharing on facebook or twitter is un-available when logged in.

To use the social media bar, please log out.