ID 526401

Archived

0.156 Mile of Construction of a Bridge Project, Atlanta GA

Fulton County

Owner Reference: M005813

Bid Date: 02/21/2020 at 10:00am

0.156 Mile of Construction of a Bridge and Approaches on Sr 169 Over Bull Creek. This work includes constructing and removing:Silt control gates, Temporary erosion control slope drains shown on the Plans or as directed. Temporary sediment basins, Sediment barriers and check dams, Rock filter dams, Stone filter berms, Stone filter rings,Other temporary erosion control structures shown on the Plans or directed by the Engineer This work also includes applying mulch (e.g., straw, hay, erosion control compost), and temporary grass. Construction exits are paid for per each. Payment is full compensation for all labor and materials including the required geotextile, construction, and removal. Construction exit tire cleaning stations are paid for per day when added to an existing construction exit. Payment is full compensation for all labor, equipment, materials, water source, and removal. This work includes clearing, grubbing, removing and disposing of vegetation, buildings and debris within the entire Right-ofWay and easement areas adjacent to the Right-of-Way or as designated by the Engineer. Except, do not remove objects designated to remain or removed according to other sections of these Specifications. This work also includes preserving (from injury and defacement) vegetation and objects designated to remain in place. This work includes constructing a cement stabilized base course by pulverizing the existing flexible pavement, underlying base and subgrade, and mixing with Portland cement. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Robbie Bridges
 (404) 631-1148
 Login or create an account To view email

Published 01/28/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.