ID 529982

Archived

1.383 Miles of Widening and Reconstruction Project, Atlanta GA

Cherokee County

Owner Reference: 0009164

Bid Date: 03/20/2020 at 10:00AM

1.383 Miles of Widening and Reconstruction on Sr 20 Beginning East of I-575/sr 417 And Extending East of Scott Rd (Cr 281). If silt control gates are required or are directed by the Engineer, follow these guidelines to construct them: Clear and grade only that portion of the roadway within the affected drainage area where the drainage structure will be constructed. This work consists of providing maintenance on temporary erosion and sediment control devices, including but not limited to the following: Silt control gates, Temporary erosion control slope drains shown on the Plans or as directed, Temporary sediment basins, Silt control gates, Check dams , Sediment barriers, Rock filter dams, Stone filter berms. It also consists of removing sediment that has accumulated at the temporary erosion and sedimentation control devices. Conditions during Project construction will affect the quantity of the silt fence to be installed. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Sara Siddall
 (404) 631-1148
 Login or create an account To view email

Published 02/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.