ID 533657

Archived

1.780 Miles of Milling, Inlay and Plant Mix Resurfacing Project, Atlanta GA

Cobb County

Owner Reference: M005943

Bid Date: 04/17/2020 at 10:00AM

1.780 Miles of Milling, Inlay and Plant Mix Resurfacing on Sr 120 Alt Beginning at Sr 120 and Extending to Us 41/sr 3 (Cobb Pkwy). This work includes furnishing, installing, and removing a water permeable filter fabric fence to remove suspended particles from drainage water. Shoulder Construction Included as a Part of the Contract When the placement of asphaltic concrete materials creates a difference in elevation greater than two inches (> 2”) between the earth shoulder (grassed or un-grassed) and the edge of travel lane or between the earth shoulder and a paved shoulder that is less than four feet (< 4’) in width, the Contractor shall place and maintain drums in accordance with the requirements of Subsection 150.2.04.B.3. When the edge of the paved surface is tapered with a safety edge, drums may be spaced at two (2) times the speed limit in MPH. Drums shall remain in place and be maintained until the difference in elevation has been eliminated by the placement of the appropriate shoulder materials. Shoulder Construction Not Included as a Part of the Contract When the placement of asphaltic concrete materials creates a difference in elevation greater than two inches (> 2”) between the earth shoulder (grassed or un-grassed) and the edge of travel lane or between the earth shoulder and a paved shoulder that is less than four feet (< 4’) in width, the Contractor shall notify the Engineer, in writing, when the resurfacing work including all punch list items has been completed. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Timothy Swink
 (404) 631-1148
 Login or create an account To view email

Published 03/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.