ID 533668
Archived
Wayne County
Owner Reference: 0008314
Bid Date: 04/17/2020 at 10:00AM
2.756 Miles of Realignment on Sr 136 Beginning at Sr 136 Conn and Extending to Sr 515. Provide both equipment and personnel to measure the application rate of cement placed. The first tanker of cement shall be checked with a square yard cloth/certified scales. Any subsequent loads may be tested at the discretion of the Engineer. Multiple checks may be necessary to ensure that the spread rate is maintained within the ± 10 percent limit. Drift material is defined as organic debris, primarily large tree limbs, that are carried by a stream and accumulate at the upstream side of bridges and culverts, impeding navigation and threatening the integrity of the drainage structure. If removal of drift material is required on the project, the following conditions are intended as a minimum to protect aquatic resources during drift removal activities executed by GDOT personnel or contractors. This project encouraged MBE/WBE participation.
Georgia Department of Transportation
Timothy Swink
(404) 631-1148
Login or create an account To view email
Published 03/24/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.