ID 495803

Archived

2018 Green Acres Project (GAP) Pipeline Valve Repairs Project, Fountain Valley, CA

Orange County

Bid Date: 04/30/2019 at 02:00PM

Pre-Bid: 04/18/2019
18700 Ward St, Fountain Valley, CA

Estimate: $90,000.00

Project consists of repairing, replacing, & adjusting to grade 17 GAP pipeline valves & other appurtenances within the cities of Costa Mesa, Fountain Valley, Huntington Beach & Santa Ana. The work includes, but is not limited to the following: obtain encroachment permits & prepare & implement traffic control plans for the work areas located in the various jurisdictions; prepare safe work plans for excavation & nuisance water control; mobilization; pavement & concrete removal & replacement; sheeting; shoring & bracing for the work in accordance with all applicable State & Federal OSHA standards; valve &/or pipeline appurtenance removal, repair & replacement; traffic stripe replacement to match existing striping & final cleanup & demobilization. Bonds required. Prevailing wages apply.

Orange County Water District

Ryan Bouley
 (714) 378-8207
 (714) 378-3373
 Login or create an account To view email

Published 04/13/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.