ID 498808

Archived

2019 Batten Road Sewer Extension Project, Duvall WA

King County

Owner Reference: 2019-19

Bid Date: 05/29/2019 at 02:00pm

Pre-Bid: 05/17/2019
onsite along Batten Road at the location of the existing sanitary sewer lift station in Duvall, WA.

Estimate: $400,000 - $450,000

Construction of approximately 1,200 LF of 8” diameter sewer main, installation of 6 sewer manholes, and decommissioning of an existing pump station. The work will include general site work, demolition, trenching, excavation, backfilling, temporary hot-mix asphalt patch, traffic control measures, and miscellaneous perimeter restoration.

City of Duvall

Shaun Tozer
 (425) 788-0257
 Login or create an account To view email

Published 05/10/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.