ID 496356
Archived
San Mateo County
Owner Reference: 85120
Bid Date: 04/30/2019 at 02:00pm
The work consists of street base failure and resurfacing on various City streets within the city limits and two shared streets with the City of Millbrae. Several different tyes of activities will be used including asphalt concrete "dig-out" repairs, asphalt concrete overlay, curb drains, reconstruction, curb and gutter repair, curb ramp improvements, surface milling traffic markings and striping, curb drains, traffic control, concrete base repair, and other related works. Bonds required. Prevailing wages
City Of Burlingame
Doris Mortenson
650.558.7230
650.342.8386
Published 04/17/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.