ID 533628

Archived

4.850 Miles of Milling, Inlay and Plant Mix Resurfacing Project, Atlanta GA

Wayne County

Owner Reference: M005919

Bid Date: 04/17/2020 at 10:00AM

4.850 Miles of Milling, Inlay and Plant Mix Resurfacing on Sr 21 Beginning North Of Smith Ave (Cs 590) and Extending South of Hendley Rd (Cs 661). This work includes clearing, grubbing, removing and disposing of vegetation, buildings and debris within the entire Right-ofWay and easement areas adjacent to the Right-of-Way or as designated by the Engineer. Except, do not remove objects designated to remain or removed according to other sections of these Specifications. This work also includes preserving (from injury and defacement) vegetation and objects designated to remain in place. Clearing also includes removing and disposing of obstructions, such as fences, bridges, buildings, and other incidental structures within the Right-of-Way unless the work or a portion of the work is: Removed as excavation, Shown in the Proposal as a separate Pay Item, Performed by others. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Timothy Swink
 (404) 631-1148
 Login or create an account To view email

Published 03/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.