ID 492911

Archived

4-Year Utility Improvement & Pavement Preservation Program Project,Year 2019, Arlington WA

Snohomish County

Owner Reference: PW 2019-001, P02.453

Bid Date: 04/04/2019 at 02:00pm

Estimate: $2.4M

Schedule A: Work under this schedule includes replacing approximately 3,900 LF of new 8-inch and 12-inch ductile iron water main and abandonment of existing asbestos concrete water mains within various City of Arlington roads. Work will also include upgrades to existing water service connections and associated meters, and a jack/bore trenchless installation of steel casing pipe on E. Highland Dr, across State Route 9. Schedule B: Work shall include providing either asphalt overlay, inlay or full depth pavement replacement of various roads within the City of Arlington. Roadways include E. Maple St., E. Union St., E. Jackson St., S. Cobb Ave., S. Macleod Ave, and S. Hazel St. Work shall also include replacement of 40 ADA curb ramps within the project boundary and minor improvements to existing sanitary sewer and stormwater structures. The Engineer’s estimate for the complete project (Schedules A & B) is $2,400,000

City of Arlington, WA

Linda Taylor
 (360) 403-3470
 Login or create an account To view email

Published 03/23/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.