ID: 528016

58th Avenue Full Depth Reclamation Project, Vero Beach FL

Indian River County

Owner Reference: 2020021

03/11/2020
Past bid date

Pre-Bid:  Login or create an account to see more project details. Basic membership is FREE

Trades: General Engineering Contractor

Licenses: A

The proposed improvements to 58th Avenue from north of 57th Street to 85th Street and 69th Street from Sta 11+84 to Sta 30+47 consist of reconstructing the roadway utilizing full depth reclamation, milling and resurfacing, widening the existing shoulders to 5-feet, structural asphalt, surface asphalt, drainage improvements, waterline directional bore, utility adjustments, signing, and pavement markings.

 Upgrade Membership
 Upgrade Membership


2020021 58th Ave FDR Specs - IRC 1325.pdf
Published 02/10/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.