ID 533667

Archived

9.403 Miles of Widening and Reconstruction Project, Gainesville GA

Wayne County

Owner Reference: 522220

Bid Date: 04/17/2020 at 10:00AM

9.403 Miles of Widening and Reconstruction on Us 1/sr 4 Beginning South of Sr 147 (Plant Hatch) and Extending South of George Hill Rd (Cr 106); Also Includes Construction of 4 Brigdes and Approaches. All pavement markings, both interim and permanent, shall be applied to a clean surface. The Contractor shall furnish the layout and preline the roadway surface for the placement of pavement markings applied as part of the temporary traffic control plan. All interim marking tape and RPM’s on the final surface shall be removed prior to the placement of the final markings. Resurfacing Projects Pavement markings shall be provided on all surfaces that are placed over existing markings. Interim and final markings shall conform in type and location to the markings that existed prior to resurfacing unless changes or additions are noted in the Contract. The replacement of parking spaces will not be required unless a specific item or note has been included in the Contract. Any work to make additions to the markings that existed prior to resurfacing is to be considered as extra work. Widening And Reconstruction Projects If the lane configuration is altered from the preconstruction layout then pavement markings will be as required by the plans or the Engineer. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Timothy Swink
 (404) 631-1148
 Login or create an account To view email

Published 03/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.