ID 498307

Archived

Agua Special Utility District US83 Relief Route Utility Relocation Phase 2 Project Palmview,TX

Hidalgo County

Bid Date: 05/28/2019 at 02:00pm

Pre-Bid: 05/14/2019
3120 North Abram Road in Palmview, Texas 78573.

The project includes the installation of approximately 6,277 LF of 8” and 12” waterline along with 1,958 LF of 16” and 20” steel casing (bore and open-cut) along with the appropriate appurtenances. Bonds required.

Agua Special Utility District, TX

Cynthia Villarreal, ext 235
 (956) 585-2459
 (956) 585-1188

Published 05/07/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.