ID 493601
Archived
Orange County
Owner Reference: 6-R-18
Bid Date: 04/24/2019 at 10:00AM
Estimate: $214,000
This is a federal-aid project. Contractor shall comply with all federal-aid requirements. The Work comprises the furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, Standard Drawings, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of but is not be limited to Mobilization; Storm Water Best Management Practices (BMPs); Excavation and Disposal; Construct and Compact Crushed Miscellaneous Base Material (CMB); Construct AC Pavement; Remove Existing and Construct PCC Alley Approach; and all associated work as identified on the construction documents. The work is located at various alley locations adjacent and parallel to Valencia St. between E. La Habra Blvd. and E. Third Ave. in the City of La Habra. Work shall be completed in 30 working days. Bonds required. Prevailing wages apply.
City of La Habra
Cesar Rangel
(562) 383-4158
Published 03/27/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.