ID 527172

Archived

Aquatics Services for Browns Mill Aquatics Park Project, Lithonia GA

Dekalb County

Owner Reference: 2020-005

Bid Date: 02/28/2020 at 05:00pm

Pre-Bid: 02/20/2020
Stonecrest City Hall, 3120 Stonecrest Blvd Stonecrest GA 30038

Setup and prepare for usage all movable equipment, including tables, chairs, lounges, and lifeguard chairs, and shade covers, etc. Clean, inspect and prepare vacuuming equipment. Check and clean all gutters and drains, including gutter covers. Drain and acid wash pools as necessary. Install ladders, check slides, place lifeguard chairs, place and clean furniture. Check all pumps and motors. Clean pool area within the pool enclosure. Circulate water through filtration system. Backwash filters and inspect for any defects. Have pools ready for operation at least ten (10) days before opening day. Complete a daily documented (written) safety check of the entire Facility, including large pool and baby pool. Clean the entire Facility, including, but not limited to the following: guard office area, all areas within the fencing, and restrooms, including proper collection of waste, garbage, and all other debris. Restroom cleaning shall be completed prior to operational hours. Enforce all rules and regulations stipulated by state regulations for public pools and the City (City Code CH.19) and suggest and advise regarding additional rules and regulations for the operation of the pool. Maintain tests and records for the Facility as may be required by the State of Georgia, DeKalb County, and the City and meet all requirements for such. Furnish and supply first aid kits adequate to the size and operation of the Facility. The First Aid Kit shall carry supplies for a minimum of 100 persons and at minimum include: adhesive bandages, sterile pads, gauge pads, eye pads, tape, dressings, elastic bandage, antiseptic, ammonia inhalants, rescue blanket, scissors, tweezers, latex gloves, clean wipes, eye wash, elastic gauze, butterfly closure, large bandage patch. The First Aid Kit should also include a pocket mask with a oneway valve, and a bodily fluid exposure kit. The Contractor shall also provide first responder first aid kits, including rubber gloves and pocket mask with one-way valve, for all on duty personnel. Any alterations, improvements, installation or fixtures or major repairs to be undertaken by Operator shall have the prior written approval of City after Operator has submitted plan/work plan for any such proposed alterations, improvements, fixtures and major repairs to City in writing. Such consent shall not be unreasonably withheld by City. This project encouraged MBE/WBE participation.

City of Stonecrest

Sean DePalma
 (770) 224-0200
 Login or create an account To view email

Published 02/03/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.