ID 527749

Archived

Automatic Transfer Switch (ATS) Installation Project, Valdosta GA

Lowndes County

Owner Reference: 2020-05

Bid Date: 03/10/2020 at 10:00am

Pre-Bid: 02/20/2020
City Utilities Department Conference Room located at the Utilities Department at 1016 Myrtle Street

Sealed bids for the Automatic Transfer Switch (ATS) Installation Project . The contractor shall supply and install ten (10) automatic transfer switches for ten existing generators at select lift stations. Bids shall be submitted for all work and labor related to furnishing and installing all materials for the project. The winning bidder shall supply and install ten (10) generator automatic transfer switches at ten lift station locations. Bids shall be submitted for all work and labor related to furnishing and installing all materials for the project and be based on the most practical, feasible and cost-effective method for completing the work. The entire Project will be bid as one (1) package. Each Bid must be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Security in the amount of five (5) percent of the Bid. The Bid Security must be in the form of Bid Bond or certified check.

City of Valdosta, GA

David Frost
 (229) 259-3592
 Login or create an account To view email

Published 02/06/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.