ID 506794

Archived

Baggage Optimization Project, Phase 2, Seattle WA

King County

Owner Reference: MC-0319501

Bid Date: 09/06/2019 at 02:00pm

Pre-Bid: 08/29/2019
Central Auditorium and Thursday, August 29, 2019 at Beijing Room 11:00 a.m. to 12 Noon at the Conference Center at Seattle – Tacoma International Airport at 17801 International Boulevard Seattle, WA 98158. A site tour will follow the pre-bid meeting from 1:00 p.m. to 4:30 p.m. PPE (hard hat, safety vest, safety glasses, safety shoes or boots, gloves and hearing protection) will be required.

Estimate: $90.0M - $180.0M

WMBE goal 2% Scope of work includes: 1. Demolish and replace existing C1, C25, C88 (Terminal only), C92 (Terminal only), and C96 Baggage Handling Systems (BHS). 2. Construct the final BHS sortation matrix in the north main terminal. 3. Provide layout, electrical supply power, communications, and integration to the BHS conveyor and controls of the Transportation Security Administration (TSA) provided explosive detection system (EDS) machines in the Basement Level. This consists of two (2) new EDS pods with two (2) machines in each pod. 4. Demolish and replace the entire C25 BHS through the underground tunnel to the Ramp level at the South Satellite. This adds additional outbound lines in the existing baggage tunnel, replaces two (2) makeup units, provide automatic tag readers (ATR) and crossovers and demolishes the existing claims in the Federal Inspection Services (FIS) area. 5. Modify/ and replace the existing Claim 1 feed 6. Replace the existing South Satellite C25-IB1 transfer input conveyor subsystem in its entirety. 7. Construct the new North-End odd-size BHS (Zone 7) and relocate existing TSA Owned CT-80. 8. Demolish C22 odd-size BHS and construct a new centralized odd-size subsystem. Modify ticket level doghouse and penetration to facilitate new centralized odd-size feed conveyor. Reconfigure TSA support equipment. 9. Construction of C92 final connections. 10. Remove and decommission various existing BHS components. 11. Demolish and install BHS make-up devices. 12. Relocate the existing tenant storage area from the Central Terminal basement level to the ramp level in the C1 building. 13. Relocate, modify and add new structural, architectural and utility systems. 14. Demolish the existing maintenance conveyor shop and construct a new shop on ramp level 15. Construct, modify and demolish various construction elements, such as wall, ceiling, flooring and finish work. 16. Complete all MEP requirements to facilitate this work per the contract documents. 17. Perform various Regulated Material abatement. 18. Modify MK 8 feed line. 19. All system testing and commissioning, labor and testing materials. 20. Expand on screen resolution (OSR) functionality to accommodate new systems 21. Modify existing upper level controls to incorporate the new BHS. 1,185 calendar days

Port of Seattle Commission

Stan Evans
 (206) 787-7601
 Login or create an account To view email

Published 07/23/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.