ID 506105
Archived
Orange County
Owner Reference: 19-02
Bid Date: 08/20/2019 at 02:00pm
Estimate: $950,000
The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor and incidentals as required by the contract documents to construct the above stated project. The general items of work to be done hereunder consist of: clearing and grubbing, excavation, compaction, reinforced concrete footings and slab on grade, construction of shelters consisting of cultured stone, steel and various other metal components, electrical and lighting, removing and replacing street furniture and improvements at each shelter and other bus stop locations in the city. Prevailing wages. Bonds required.
City of Laguna Niguel, Public Works, CA
JC Herrera
(949) 362-4300
(949) 362-4385
Published 08/06/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.