ID 504457
Archived
Los Angeles County
Bid Date: 07/23/2019 at 02:00pm
Estimate: $5.0M -$8.0M
The work consists of rehabilitating approximately 14,854 feet of existing 30-, 33-, 36- and 39-inch diameter reinforced concrete pipe (RCP) and 18-inch vitrified clay pipe (VCP) with cured-in-place pipe (CIPP) liners. The project will also be rehabilitating approximately forty four (44) manholes/structures with calcium aluminate cement (CAC) coating, one (1) manhole/structure with flexible PVC liner, and all appurtenant work. 210 calendar days
County Sanitation District No. 3, Engineering, Los Angeles, CA
Jenny Hsu x 1618
(562) 908-4288
Published 06/28/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.