ID 527837
Archived
Brazos County
Owner Reference: RFP 20-031/WW1800008
Bid Date: 03/11/2020 at 02:00pm
Pre-Bid: 02/20/2020
City Hall, Second Floor Conference Room 1, 1101 Texas Ave S, College Station, Texas.
Estimate: $3.9 mil
Construction of improvements to the electrical and instrumentation components of the existing centrifuge and the the installation of a second, redundant centrifuge at the Carters Creek Wastewater Treatment Plant. Q&A due by 02/27/20 at 2PM. Bonds required. Prevailing wages.
City of College Station, Texas
Cheryl K. Turney, C.P.M.
(979) 764-3555
(979) 764-3899
Login or create an account To view email
Published 03/06/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.