ID 497374

Archived

Central Campus Electrical Upgrade Phase 2 – Distribution Project, Raleigh NC

Wake County

Bid Date: 05/23/2019 at 05:00pm

The NC State campus between Western Boulevard and Hillsborough Street has an aging underground electrical distribution system with components that have exceeded their useful life. The campus electrical infrastructure master plan will replace the aging infrastructure and install a new mainline loop configuration system to improve resiliency, capacity, and safety. The overall master plan is currently divided into 10 phases with Phase 1 almost complete. This specific project is to complete Phase 2 construction of a 15kV distribution system to include installation of new underground ductbank, cables, manholes, and switchgear for the electrical infrastructure improvements in the central precinct of campus from Wolf Village, along Western Blvd, to the intersection of Sullivan Drive and Dan Allen Drive.

North Carolina State University

Damian Lallathin
 (919) 515-2011
 Login or create an account To view email

Published 04/29/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.