ID 506530

Archived

Channel Dredging Project, Burbank WA

Franklin County

Bid Date: 08/13/2019 at 02:00pm

Pre-Bid: 07/31/2019
Two hosted pre-bid site visits are scheduled for July 31st, at 10:00 am and August 7th, at 10:00 am. Other site visits may be allowed at the Districts discretion. The meeting location will be at the Casey Pond boat launch. From the intersection of Hwy 12 and Hanson Loop Rd., head SW approximately .6 miles. Turn left on to the gravel access road. The boat launch is roughly 0.9 miles down this road

The project consists of dredging the approach channel to an irrigation pumping plant. Approximately 1,800 cubic yards of accumulated silt will be removed from the channel by a hydraulic dredge and pumped to a designated disposal site nearby. All work shall be within the existing USBR rights-of-way and designated work zones. The project will be located in Irrigation Block 3 of the South Columbia Basin Irrigation District near the town of Burbank, WA. Work will take place within Casey Pond of the McNary Pool on the Columbia River. Contractor cannot begin dredging activities until November 1st, 2019 and must complete all work by February 28th, 2020

South Columbia Basin Irrigation District, WA
 (509) 547-1735

Published 07/19/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.