ID 499269

Archived

Cherry Crest Pump Station Replacement Project, Bellevue WA

King County

Owner Reference: 19044

Bid Date: 06/05/2019 at 10:00am

Pre-Bid: 05/23/2019
at the project site, 2532 127th Avenue NE, Bellevue, WA 98005

Estimate: $6.0M - $6.7M

Work contemplated to be performed under this contract is as follows: · Construction of a new at-grade pump station with six pumps having a firm capacity of 3,600 gallons per minute (gpm), two 2,640 gallon pressure tanks, split-faced CMU walls, and an onsite emergency generator · Demolition and removal of the existing Cherry Crest Pump Station. · Onsite piping improvements · Offsite water main improvements consisting of approximately 1,800 linear feet of 16-inch diameter ductile iron water main, 1,500 linear feet of 8-inch diameter water main, a pressure reducing valve vault, and appurtenances.

City of Bellevue, WA

Jay Hummel
 (425) 452-7876
 Login or create an account To view email

Published 05/15/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.