ID 527570

Archived

Clifton Wastewater Treatment Plant (WWTP) Parshall Flume Project, Clifton AZ

Graham County

Bid Date: 03/09/2020 at 02:00pm

Pre-Bid: 02/12/2020
Clifton Town Hall, 510 N. Coronado Boulevard, Clifton, Arizona 85533.

The purpose of this project is to repair and renovate the existing Parshall flume by coating the structure for corrosion protection, install a new flow meter and associated equipment, install new lighting and install new aluminum grating over the Parshall flume.

Town of Clifton, AZ

Dave Shreeve, Bowman
 (928) 428-3898
 (928) 865-4472
 Login or create an account To view email

Published 02/05/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.