ID 528624

Archived

CMAR For Harmon Road US 287/81 to Golden Triangle Blvd Project Fort Worth,TX

Tarrant County

Owner Reference: 100459

Bid Date: 02/27/2020 at 01:30PM

The Project consists of reconstruction of 2 miles of a four-lane divided (4-11’ lanes) concrete neighbhorhood connector street, median and wide sidewalks/bike lanes, retaining walls, streetlights, roundabouts, drainage improvements, 36”water line relocation, 8” sanitary sewer, and landscaping.work will be performed within City and TxDOT right-of-way and easements. The City’s Engineer is in the process of completing the final engineering design for the Project. Right-of-Way (“ROW”) acquisition is under way and anticipated to be complete by May, 2020. Franchise Utilities are designing the relocations with an expected relocation date of December, 2020. Preconstruction Phase Services are expected to start in May, 2020 and be completed December, 2020. GMP presentation to City is expected at or before the time Preconstruction Phase Services are essentially complete. Construction Phase Services are expected to start in January, 2021 and be completed by January, 2023. The Project is expected to include the following improvements: 1. Site preparation, demolition/removals and earthwork 2. Storm Drain: • Approximately 2,740 LF of RCP Storm Drain • Approximately 3,900 LF of RCB ,Three (3) major box culvert crossings/outfalls 2. Water , Approximately 380 LF of 36” Water Line (at the intersection of Golden Triangle and Harmon Road) , Approximately 120 LF of 24” Water Line (at the intersection of Golden Triangle and Harmon Road) ,,Note the following restrictions on the water transmission construction: i. Existing Transmission lines shall only be shut-down once. ii. Transmission lines may not be out of service during the high-demand season, defined as March 1 through December 1. 3. Sanitary Sewer , Approximately 1,700 LF of 8” Sanitary Sewer 4. Roadway and Roundabout Construction: , Approximately 50,000 SY of 11” Concrete pavement on 8 inches of lime treated subgrade , Approximately 7,000 SY of 4” Colored/textured concrete median , Approximately 3,000 SY of 11” Colored truck apron Approximately 152,000 SF of 4” Sidewalk . 3 Concrete Roundabouts at the intersections of: Golden Triangle, Heritage Trace and Presidio Vista 2 Asphalt Roundabouts at US 287 Frontage Roads 5. Signing and Markings 6. Street Illumination 7. Traffic Signal at new Fire Station located at the intersection of Quail Grove and Harmon Road. B All MBE 11% goals. Prevailing wages.Bonds required.

City of Fort Worth, TX

Cristina Camarillo
 (817) 392-8440
 (817) 871-8440

Published 02/12/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.