ID 526459

Archived

CMAR For the Construction of Designing Downtown Denison Phase One Project Dension,TX

Grayson County

Bid Date: 02/26/2020 at 12:00PM

The City of Denison, or the “Owner”, invites well qualified Construction Manager at Risks to submit proposals for preconstruction and construction services for Construction of Designing Downtown Denison Phase One. The Construction Manager at Risk will assist the Owner with the reconstruction of Main Street from building face to building face - transforming the street into a “Street for People”. The basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price for the reconstruction of Main Street into a new flush festival street from Rusk Avenue to the railroad tracks at the Historic Katy Depot in downtown Denison. Phase one also includes – a full reconstruction of both Music Alley and Depot Alley from Rusk Avenue to Houston Avenue to include stormwater and utility infrastructure; the reconstruction of a parking lot on the southside of the 100 block; and a pocket park located at 226 Main Street. Prevailing wages.For questions regarding this Request for Proposal, please contact:Chris Lambka, PLA Toole Design clambka@tooledesign.com

City of Denison, Texas

Christine Wallentine x 2437
 (903) 465-2720
 (903) 464-4499
 Login or create an account To view email

Published 01/28/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.