Coal Creek Culvert Roughened Channel Repair Project, Bellevue WA

King County

Owner Reference: 19070

Bid Date: 05/29/2019 at 10:00am

Estimate: $130,000 - $180,000

Work contemplated to be performed under this contract is as follows: • Install temporary water diversion system • Remove existing concrete sill (weir) • Excavate large boulders and salvage for reuse • Construct roughened channel using import large boulders and salvaged boulders • Restore grades along bank and staging area • Revegetate riparian corridor in project area

City of Bellevue, WA

James Stockwell
 (425) 452-7876
 Login or create an account To view email

Published 05/15/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.