ID 526261

Archived

Colby Administration Office Upgrades Project, Everett WA

Snohomish County

Owner Reference: 2020-04

Bid Date: 03/11/2020 at 08:00pm

Pre-Bid: 02/05/2020
3107 Colby Avenue, Everett, WA 98201

Estimate: $900,000 - $999,000

HUD project. Scope includes renovation ot the existing employee restrooms, approx 700 SF located on the south side of the main floor of the building; convert an existing basement room (labeled Mechanical Equipment on the original building drawings) of approx 850 SF to a file storage room; convert the existing basement-level storage room of approx 1,500 SF to a conference room with associated storage and restrooms; convert the existing main floor conference room to a mix of new offices and workstations; and add a passenger elevator connecting the basement level, main floor and mid-point breakroom floor. The work will include asbestos abatement, electrical, data, elevator, plumbing, mechanical and structural work for a complete project. 120 calendar days.

Everett Housing Authority WA

Brenda McLeod
 (425) 303-1121
 (425) 303-1139
 Login or create an account To view email

Published 02/22/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.