ID 529954
Archived
Madison County
Owner Reference: Bid 2010
Bid Date: 03/05/2020 at 09:30AM
This specification covers the requirements for cold recycling asphalt concrete. The recycling shall be a continuous process of milling the existing pavement to the specified width and depth, remixing with bituminous material (unmodified or modified) and aggregate according to the approved mix design, reshaping, and compacting the asphalt mixture. Pavement locations that are milled shall have material replaced on the same day. All of the above operations shall be done in-place with no trucking of RAP allowed except for the small amount needed to remove surpluses or make up deficiencies due to pavement conditions.
County of Madison NY
Laurie Winters
(315) 366-2247
(315) 367-1409
Login or create an account To view email
Published 02/24/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.