ID 533978

Archived

Complete Turnkey Repair Or Replacement Of Existing Vertical Turbine Pump Project, Chappaqua NY

Westchester County

Owner Reference: DPW 2020-02

Bid Date: 04/17/2020 at 11:00AM

The principal features of the work are: the removal of an existing Sulzer/Johnston Vertical Turbine Pump, Model JT 16 CHC, 5-Stage/14 QMC 1-Stage and the coupled 500 HP motor, the complete rebuilding of the pump (at a certified OEM repair facility) and the complete rebuilding of the motor, the re-installation of the rebuilt pump and motor, startup and performance testing of the rebuilt units on site. Bidder shall bid on the primary (Rebuilding) Bid; they may also bid on the Alternate Bid for an entirely new pump and motor. This project encouraged MBE/WBE participation.

Town of New Castle

Bart Carey
 (914) 238-3968
 Login or create an account To view email

Published 03/29/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.