ID 504005

Archived

Construction Of Nature Trail At Briarwood Park Project, Brookhaven GA

Dekalb County

Owner Reference: 19-310

Bid Date: 07/29/2019 at 03:00PM

Pre-Bid: 07/09/2019
Briarwood Park, 2235 Briarwood Way, NE,Brookhaven

Nature trail shall be laid out and constructed so as to be woven through the woods, between the trees and over the root systems. This is a careful, interactive process between the Contractor and Project Landscape Architect. Nature trail shall be constructed in a manner that does not disrupt the tree root systems or require unnecessary removal of trees or cutting of roots. Nature trail shall be constructed at the locations and to the dimensions, lines and cross section indicated on the Drawings or as directed by the Project Landscape Architect and in conformity with the provisions and requirements set out in these Specifications. Nature trail shall include all the necessary excavation, unless otherwise indicated, subgrade and subbase preparation, backfilling, final clearing-up, and completing all incidentals thereto, as indicated on the Drawings or as directed by the Project Landscape Architect. Contractor shall visit the site to verify the extent of clearing, grading, staking and tree root zone protection necessary for the construction of trails. This project encouraged MBE/WBE participation.

City of Brookhaven

Linda Nabers
 (404) 637-0500
 Login or create an account To view email

Published 06/24/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.