ID 498438

Archived

Deer Creek Phase IX - Water Supply Plant No. 8 Expansion Project, Annetta, TX

Parker County

Owner Reference: 21627

Bid Date: 05/23/2019 at 11:00am

Estimate: $500,000

The Stonegate Partners - Deer Creek is inviting bids for all labor, tools, equipment, and expenses to increase its water supply, storage, pressure maintenance, and pumping capacities to provide additional service to Deer Creek Phase IX, a new 71 lot subdivision. The project includes two (2) public supply water wells - one intended to provide 41 gpm and the second to provide 25 gpm; a 94,000 gallon ground storage tank, a 5,000 gallon hydropneumatic pressure tank, three (3) 250 gpm booster pumps, chlorination system, SCADA, and a 12' x 19' cmu control building. Bonds required. Prevailing wages apply.

Stonegate Partners, LLC, TX

Glenn Breisch
 (214) 350-6500
 Login or create an account To view email

Published 05/07/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.