ID 529987

Archived

Design-Build Services For Rutgers Tube Rehabilitation Project, New York NY

New York County

Owner Reference: P-36444

Bid Date: 04/09/2020 at 02:00PM

Pre-Bid: 03/03/2020
2nd Floor, Conference Room D2.10, 2 Broadway, New York, NY 10004

The Work consists of the performance of design, construction, installation, and commissioning of communication systems, traction power systems, cellular infrastructure, a cable management rack system, mechanical, electrical, and plumbing systems, track and signals systems, and related civil work. MTA seeks to retain the services of a design-build team for the design and construction of the Rutgers Tube Rehabilitation Project to rehabilitate systems and components within the Rutgers Tube to achieve a State of Good Repair and make those systems and components more resilient to extreme weather events (the “Work”).

MTA - NYC Transit (NYCT)

Robert Newhouser
 (646) 252-6101
 (646) 252-6108
 Login or create an account To view email

Published 02/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.