ID 504344

Archived

Downtown Complete Streets Implementation Phase 1A-1B-2A Project San Diego,Ca

San Diego County

Owner Reference: K-19-1849-DBB-3

Bid Date: 07/30/2019 at 02:00pm

Estimate: $2,430,000

This Project proposes improving mobility in Downtown San Diego by installing ADA compliant curb ramps and creating a network of cycle way facilities throughout downtown. The current construction plan (Phases 1A-1B-2A) includes installing cycle tracks along Beech Ave, 6th Ave, J Street, C Street and Park Blvd. The work also proposes street resurfacing, traffic signal modifications, striping, signage, installation of flexible post delineators, replacement of existing curb, gutter, and sidewalks affected by the curb ramp upgrades. The Project is located in the Downtown Community Area and the CD 3 Council District.Bonds required. Prevailing wages.

City of San Diego, Public Works, CA

Spencer Deane
 (619) 533-5265
 (619) 533-3633
 Login or create an account To view email

Published 06/26/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.