ID 528569

Archived

Emergency Watershed Protection-Willow Fork of Buffalo Bayou Channel Bank Stabilization Phase 6 for Fort Bend County Drainage District Project Richmond,TX

Fort Bend County

Owner Reference: B20-063

Bid Date: 03/03/2020 at 02:00pm

Pre-Bid: 02/18/2020
Fort Bend County Purchasing Department located in the Travis Annex at 301 Jackson, Suite 201, Richmond, Texas 77469, with a site visit immediately following, (if needed).

It is the intent of Fort Bend County to contract with one (1) contractor for all materials, supplies, equipment, tools, services, labor and supervision necessary for emergency watershed protection for Willow Fork of Buffalo Bayou channel bank stabilization, Phase 6Q&A due by 02/25/20 at 10AM. Bonds required. Prevailing wages.

County of Fort Bend, Purchasing, TX

Jaime Kovar
 (281) 341-8643
 (281) 341-8645
 Login or create an account To view email

Published 02/12/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.