ID 502976

Archived

Fire Alarm System Replacement Project, Phase 2, Alameda Co CA

Alameda County

Owner Reference: BARTD-15IJ-120A

Bid Date: 07/23/2019 at 02:00pm

Estimate: $1.0M - $5.0M

The existing fire alarm system, including sensors, notification devices, control panels, and conduit raceways including conductors at the BART passenger stations are obsolete and require replacement with new a fire alarm system that meets the latest National Fire Protection Association (NFPA) 72, California Building Code (CBC), National Electrical Code (NEC), local fire codes, and BART Facilities Standards as described in Specification Section 01 11 00, Summary of Work. 1.Station K10- 12th Street Station Oakland; 2 Station K20- 19th Street Station, Oakland ; 3.Station R30 - North Berkeley Station, Berkeley

San Francisco Bay Area Rapid Transit District, Purchasing, CA

Erica A Elkington
 (510) 464-7546
 (510) 464-6011
 Login or create an account To view email

Published 06/14/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.