ID 505602
Archived
Denton County
Owner Reference: 2019-144-B
Bid Date: 08/07/2019 at 11:00AM
Estimate: $980,000
The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of approximately four thousand eight hundred (4,800) linear feet of 12-inch water pipe, The FM 2499 12-inch Water Line Phase I project runs generally from Sagebrush Drive to Dixon Lane Location is Dixon to South of FM 1171. Prevailing wages. Q&A due by 07/25/19 at Noon. Bonds required.
Town of Flower Mound, Texas
Sabrina Zadow
(972) 874-6007
(972) 874-6478
Login or create an account To view email
Published 07/09/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.