ID 504427

Archived

Furnish & Install PAX Mixers Project, Vernon CA

Los Angeles County

Bid Date: 07/18/2019 at 03:00pm

Pre-Bid: 07/08/2019
Pub Utilities Conf Rm 4, 4305 Santa Fe Ave, Vernon CA 90058

Furnish two (2) PAX PWM400V3 Mixer Wet Assembly and supporting appurtenances including cable to Control Center Dry Assembly with SCADA capability, PCC405V3 PAX Control Center, in the City’s 10 million gallon (MG) reservoir located at 4305 Santa Fe Avenue, Vernon CA 90058. Each mixer shall have the ability to function continuously on a year-round basis,regardless of drain and fill cycles. Each mixer shall consist of a water-filled submersible motor,an impeller, and a non-submersible control center that houses all the control electronics. The Contractor will be responsible to provide a qualified diver to install the mixers in the reservoir.The Control Center Dry Assembly with SCADA compatibility will be installed by others. TheContractor shall coordinate with City staff to complete the work.

City of Vernon (power)

Mark Aumentado x 309
 (323) 583-8811
 Login or create an account To view email

Published 06/28/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.