ID 497152

Archived

FY 2018-2019 CIPP & Point Repair Projects Phase 2, Salt Lake City, UT

Salt Lake County

Owner Reference: 525002796

Bid Date: 05/24/2019 at 02:00pm

Pre-Bid: 05/08/2019
1530 S. West Temple, Suite 101, Salt Lake City, UT

Estimate: $1,510,771.00

The City of Salt Lake City Utilities Department is inviting bids for all labor, tools, equipment, and expenses to provide Rehabilitating approximately 11,200 feet of small diameter sewer pipe utilizing cured-inplace pipe (CIPP) and open cut construction methods at various locations throughout Salt Lake City. The anticipated term of the contract is 150 calendar days. Bonds required. Prevailing wages apply.

City Of Salt Lake City Utah Utilities

Kevin Kranendonk
 (801) 483-6841
 Login or create an account To view email

Published 04/26/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.