ID 506943

Archived

FY19 Snohomish River Channel Maintenance Dredging, Everett, WA

Snohomish County

Owner Reference: W912DW19B0005

Bid Date: 08/27/2019 at 11:00am

Estimate: $1.0M - $5.0M

Seattle District requires hydraulic maintenance dredging of the Upper Settling Basin and the Federal channel adjacent to the Lower Settling Basins in the Snohomish River Federal navigation channel. The volume of sediment to be dredged from the Upper Settling Basin is approximately 100,000 cubic yards with placement at the City of Everett property Site O, near the dredge area. For the channel segment adjacent to the Lower Settling Basin, the Contractor shall hydraulically dredge approximately 40,000 cubic yards of sediment with placement at the western shore of Jetty Island. In-water work begins 16 October 2019 and all in-water work must be completed by 14 February 2020.

US Department of the Army (Seattle)

Gregory Cook
 (206) 764-6692
 Login or create an account To view email

Published 07/24/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.