ID 522556

Archived

FY2019-20 Street Repair & Resurfacing Project, Oakley, CA

Contra Costa County

Owner Reference: CIP 237

Bid Date: 02/25/2020 at 02:00pm

The City of Oakley is inviting bids for all labor, tools, equipment, and expenses to provide mobilization, water pollution control program, traffic control, Hot Mix Asphalt (HMA) repair of the roadway, cold planing, crack sealing, slurry sealing, Rubberized Hot Mix Asphalt (RHMA) overlay, concrete sidewalk, curb and gutter repairs, tree root pruning and installation of root barrier, lower and adjusting to finish grade utility facilities, traffic striping, clean-up, and various other items as specified in the Contract Documents. Bonds required. Prevailing wages apply. Time to complete is 60 working days.

City of Oakley

Jason Kabalin
 925.625.7000
 925.625.9194

Published 12/18/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.