ID 512080

Archived

Governor's Office of Storm Recovery Gerrittsen Beach Fire Department Storm Hardening and Associated Asbestos Abatement Project, New York, NY

New York County

Owner Reference: 3252509999/CR32

Bid Date: 10/10/2019 at 02:00pm

Estimate: $400,000 to $525,000

Install flood mitigation barriers, remove existing roof & install new EPDM roofing system, Remove existing apparatus concrete fllor slab & install new 8" reinforced concrete slab, install new epoxy flooring system throughout apparatus room, infill crawl space, replace concrete sidewalk,provide new roof dunnage and antenna support structure, relocate generator, replace notification siren/ air horn, replace exiting light with new LED lighting, relocate generator, replace pipes and house trap. This project encouraged MBE/WBE participation.

Dormitory Authority of the State of New York

Peter Jackson
 (212) 273-5108
 Login or create an account To view email

Published 09/12/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.