ID 524528
Archived
Guilford County
Owner Reference: 2018-046A
Bid Date: 02/20/2020 at 02:00pm
Pre-Bid: 01/23/2020
Melvin Municipal Office Building 3rd Floor Engineering Conference located at 300 West Washington Street Greensboro, NC
The work in this contract consists of addition of a Water Booster Station to the existing Groometown Road Water Tank. This includes installation of two new 2.5 MGD centrifugal axial split case pumps, new valving and piping, chlorine room and tablet feed chlorinator, jib crane, suspended ceiling, HVAC system, control and power panels, 150 kW diesel stand-by generator, new power service, fence installation and sitework. The work in this contract also consists of abandonment of an existing water booster station and pipework at High Point Road Water Booster Station. This project encouraged MBE/WBE participation.
City of Greensboro
John Fersner
(706) 453-7674
Login or create an account To view email
Published 01/10/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.