ID 527073

Archived

Hallinan ES Renovation Project, Lake Oswego OR

Clackamas County

Bid Date: 02/27/2020 at 04:00pm

Pre-Bid: 02/06/2020
Hallinan Elementary School, 16800 Hawthorne Drive, Lake Oswego, Oregon 97034

A. Summary Project Description: 1. The existing Hallinan Elementary School is a one-story, 46,310 sf, building with a mechanical mezzanines and a 4,661 sf attached covered play area constructed in 1980. The proposed Hallinan Elementary School Renovation project includes deferred maintenance, voluntary safety and seismic upgrades, accessibility updates and plumbing renovations. Deferred maintenance items include a full roof replacement, replacement of damaged or failing envelope materials, replacement of the existing entry canopy, HVAC repairs, complete masonry envelope replacement, replacement of exterior windows and doors with higher performing frames and safety/security glazing and associated site improvements. Renovations include the removal of unbraced walls and seismically unbraced library loft to be replaced with a newly remodeled library space with a meeting room and office as well as the renovation of a classroom teaching walls. A new building addition is proposed to house a new Maker Space. B. Contract Scope: Construction, demolition, and renovation.

Lake Oswego School District, OR

David Lageson
 (503) 534-2361
 Login or create an account To view email

Published 02/01/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.