ID 506005

Archived

Harry Wurzbach Austin Highway Improvements Project, San Antonio, TX

Bexar County

Bid Date: 08/13/2019 at 02:00pm

Pre-Bid: 07/22/2019
114 W. Commerce Street; San Antonio, Texas 78205 Municipal Plaza Building 9th Floor Conference Room.

Estimate: $17,800,000.00

The City of San Antonio is inviting bids for all labor, tools, equipment, and expenses to provide the construction of the connector ramps and intersection improvements. Services expected to be performed include, but are not limited to, asphalt work, concrete flatwork (curbs,gutters, sidewalks, driveway approaches), utility work (water, sewer, gas), illumination, signal work, pavement markings and stripings, and landscaping. Bonds required. Prevailing wages apply. Time to complete is 674 days.

City of San Antonio, TX

Abigail Johnston
 (210) 207-7260
 (210) 207-7270

Published 07/14/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.