ID 498411

Archived

Holly Road- Rodd Field Road To Ennis Joslin Road Paving Project, Corpus Christi, TX

Nueces County

Owner Reference: 18021A

Bid Date: 07/17/2019 at 02:00pm

Pre-Bid: 05/14/2019
City Hall Building SMART Board Conference Room, 3rd floor, Engineering Services, 1201 Leopard Street, Corpus Christi, TX 78401

Estimate: $10,244,000

The City of Corpus Christi Engineering Services is inviting bids for all labor, tools, equipment, and expenses to reconstruction of Holly Road from Rodd Field Road to Ennis Joslin Road (approximately 4,200 LF) as a C2 Collector with one (1) 11’ wide driving lane in each direction and a 12’ wide continuous, left-turn lane down the middle with 6” standard curb and gutter and 5’ wide concrete sidewalks on each side of the road and new curb ramps at the street intersections (New pavement section to be HMAC.);storm water improvements including 5’ curb inlets and 18” and 24” RCP laterals and a trunk main composed of 4’x2’, 6’x2’, 8’x2’ box culverts concrete junction boxes, concrete headwalls, and re-grading of southside ditch from Ennis Joslin Road to the east side of Paul Jones Ave with three (3) single, 8’x2’ box culvert crossings with headwalls; replacement of existing 30” D.I. water transmission main with new 30” C905 PVC main from Rodd Field Road to Ennis Joslin Road; and, new 8” and 12” water distribution mains. Bonds required. Prevailing wages apply. Time to complete is 540 days. Bonds required. Prevailing wages apply.

City of Corpus Christi, TX

Sarah West
 (361) 826-3500

Published 06/13/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.