ID 494439

Archived

Installation of Replace Roof Project, Macon GA

Bibb County

Bid Date: 04/30/2019 at 02:00pm

Pre-Bid: 04/16/2019
Macon Water Authority Engineering Department, 537 Hemlock Street, Conference Room, Macon, Georgia 31202

Project consists of the replacement of an existing natural slate roof area and replacing with synthetic slate as well as the removal a modified bitumen roof area and installation of a PVC membrane at the Hazel Street-McCaw Building. The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the Contractor. The Project will be awarded by base bid on a lump sum basis for the performance and completion of all Work required by the Contract Documents. The following contractors have been "Pre-Qualified" and are as follows: All Roof Solutions, Inc. Exterior Solutions of Georgia, Inc./dba/ Bone Dry Roofing Company Skyline Construction Services L.E. Schwartz & Son, Inc. Pittman-Waller Roofing Company, Inc. The Contract Documents include, but may not be limited to, the Instructions to Bidders, the Contract Agreement, the General Conditions, the Drawings, the Specifications and the forms of Bid Bond, Performance Bond, and Payment Bond. Each Bid must be accompanied by a Bid Bond in the amount of 10% of the Bid, prepared on the form of Bid Bond that is part of the Contract Documents, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570.

Macon Water Authority

Mike Clark
 (478) 292-6471
 Login or create an account To view email

Published 04/03/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.