ID 499919

Archived

Kitchen Refrigeration Equipment Water Cooling And Air Handling Unit Replacement Project, Chapel Hill NC

Orange County

Owner Reference: 48-1909

Bid Date: 05/28/2019 at 02:00pm

The work includes but is not limited to the demolition of the existing cooling tower serving main kitchen refrigeration compressors and the installation of a plate and frame heat exchanger with plant chilled water as the cooling medium and condenser water as the cooled medium for the express purpose of provided cooling water to the refrigeration condensers serving the main kitchen at UNC Hospital. Work shall also include removal of exsiting water cooled heat pump air conditioning unit serve by this cooling tower and replacing with new chilled water cooled air conditioning unit and associated controls. This project encouraged MBE/WBE participation.

UNC Hospital

Don Nichols
 (984) 974-1000
 Login or create an account To view email

Published 05/22/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.