ID 529047
Archived
Wichita County
Owner Reference: 20-08
Bid Date: 03/10/2020 at 02:00pm
Pre-Bid: 02/24/2020
Memorial Auditorium, Room 500
Estimate: $3.6 Mil
This project is generally described as the repair of approximately 3,000 linear feet of the upstream slope of the dam with regrading, fill, and compaction of the slope, the addition of geotextile fabric, gravel bedding, rock riprap, the reconstruction of the road on the crest of the dam and associated work.Bonds required. Prevailing wages.
City of Wichita Falls, Texas
Jains Murphy
(940) 735-7345
(940) 761-7688
Published 03/04/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.