ID 533721

Archived

LAS Reconstruction Of Holding Pad 8, North tear Drop & Gate 38 Project, Las Vegas, NV

Clark County

Owner Reference: 3014

Bid Date: 04/09/2020 at 01:30PM

Pre-Bid: 03/18/2020
Department of Aviation, Contracts Office, 1845 East Russel Road, 3rd Floor, Las Vegas, NV 89119

This project is located at McCarran International Airport and includes the reconstruction of two (2) holding pads (Holding Pad 8 and the North Tear Drop) as well as reconstruction of Access Gate 38. The existing holding pad pavements are constructed of both Asphalt Concrete (AC) and Portland Cement Concrete (PCC) and will be replaced with new PCC pavement. The project will include drainage improvements within the limits of the holding pads (installation of new trench drains and storm drain piping), as well as high mast lighting, electrical duct-banks, taxiway lighting, airfield surface markings and airfield security fencing. Reconstruction of Access Gate 38 will include demolition of existing Gate 38 and existing AC pavement, and installation of new guard shack facilities, new AC and PCC pavements, parking striping, security cameras, security fencing, electrical and communication raceways, high mast lighting, and security sliding gate assembly. Federally funded. Bonds required. Prevailing wages apply.

McCarran International Airport, General Aviation Airport,NV

Iryna Foskaris
 (702) 261-4697
 (702) 261-5050
 Login or create an account To view email

Published 03/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.